The Northeast Bounday Tunnel (NEBT) is the biggest component of DC Water’s Clean Rivers Project that consists of a sewer tunnel increasing the capacity of the District’s sewer system. VSL is responsible for the ventilation control building electrical scope of work. This work includes a motor control center located in the electrical room of the building that VSL purchased and installed while connecting all instrumentation and electrical components to regulate air flow for the tunnel. The value of the contract is $1,425,000.

Technical Details:

  • Surface mounted electrical conduit
  • Exterior conduit duct bank
  • Explosion-proof exterior mounted junction boxes
  • Motor Control Center
  • Electric vehicle charging station
  • Fire alarm devices
  • Interior/exterior light fixtures
  • Lightning Protection system
  • Pull/terminate conductor cable and instrumentation cable
  • Electrical system startup and energization