The 495 NEXT project is a public-private partnership between the Commonwealth of Virginia and Transurban that involves extending the 495 Express Lanes north by two-and-a-half miles from the Dulles Corridor to the George Washington Memorial Parkway. This project will alleviate the congestion and traffic in this region by providing the traveling public with an alternative transportation method utilizing the express lanes. VSL’s scope includes all signage, lighting, and signalization for the project. The contract value is $16,700,000.

Technical Details:

  • Light Pole Foundations
  • Light Poles & Luminaires
  • Trenched Conduit
  • Conductor Cable
  • Lighting Load Centers
  • Electrical Services
  • Sign Structure Foundations
  • Signs and Sign Structure Installation
  • Ground Mounted Signs
  • Temporary Signalization
  • Permanent Signalization at Georgetown Pike