dominion Boulevard
Technical Details:
The Dominion Boulevard Project consisted of a new 95-foot-high, fixed-span, four-lane bridge which replaced the two-lane moveable steel bridge. The roadway was widened from two lanes to four lanes from Grassfield Pkwy. to I-64. Interchanges were constructed at Cedar Rd., Bainbridge Blvd./Dominion Lakes and Great Bridge Blvd. A fully automated system was implemented to collect tolls using E-ZPass or toll-by-plate. Construction began in January of 2013 and tolling began in February of 2017. The project was completed ahead of schedule.
Scope of work included but was not limited to:
- Over 400,000 LF of Conductor
- Approximately 14,000 SF of Sign Panel
- Approximately 20 Overhead Sign Structures and Toll Gantries
- DMS
- Over 500 CY of Concrete Foundations
- Approximately 350 Luminaires, Associated Light Poles, and Electrical Services
- 7 Traffic Signal Intersections
Benefits/Positive Aspects to Community:
- Enhanced safety due to less congestion, fewer stops and better access
- No bridge openings
- No stop lights between Grassfield Pkwy. and the Interstate
- Four lanes of traffic with interchanges
- Improved hurricane evacuation route
- Faster public safety response times